2022 Sportsman 352

Change Order

This 2022 Sportsman 352, "Change Order," is a top-tier offshore center console loaded with premium features and powered by twin Yamaha 425 outboards with digital electric steering and low hours under 300, backed by an extended engine warranty. Built for serious performance and all-day comfort, she blends innovative technology, high-end finishes, and genuine fishability.


At the helm, dual Garmin GPSMAP 8622 22" displays, a Yamaha Command Link Plus CL7 touchscreen, and SeaStar Maximus digital switching pair with an Edson stainless steel steering wheel and a JL Audio M6 sound system with 12 speakers. Anglers will appreciate dual 30-gallon pressurized aquarium livewells, macerated in-deck fish boxes, six flush-mounted gunwale rod holders, and a high-speed livewell pickup and sea chest.


Comfort runs just as deep, with triple premium captain's chairs, a rear-facing seat with sink, an electric-actuated bow table and sun deck, and a console berth with sleeping for two adults plus a child, complete with sink, shower, and porcelain head. Built on SportTech vacuum-infusion hull construction backed by a 10-year hull warranty, this 35-foot center console is turnkey and ready for anything — whether you're heading offshore or entertaining at the sandbar.


Sandy Hook Yacht Sales is pleased to assist you in the purchase of this vessel. This boat is centrally listed by DH Yacht Sales. It is offered as a convenience by this broker/dealer to its clients and is not intended to convey direct representation of a particular vessel

SPECIFICATIONS

  • PRICE $269,000
  • VESSEL NAME Change Order
  • LOCATION West Palm Beach , Florida
  • MANUFACTURER Sportsman
  • MODEL 352
  • MODEL YEAR 2022
  • TYPE Center Consoles
  • CONDITION Used
  • HULL MATERIAL Fiberglass
  • LENGTH OVERALL 35 Feet  2 Inches
  • BEAM 11 Feet  2 Inches
  • DRY WEIGHT 9850 lb
  • NUMBER OF ENGINES 2
  • NUMBER OF ENGINES 2
  • TOTAL ENGINE POWER 850 HP
  • ENGINE 1 MAKE Yamaha
  • ENGINE 1 MODEL XF425NSA2
  • ENGINE HOURS 250.00
  • ENGINE 1 FUEL Gas/Petrol
  • ENGINE 1 POWER 425 HP
  • ENGINE 1 YEAR 2022
  • ENGINE 2 MAKE Yamaha
  • ENGINE 2 MODEL XF425NSA2
  • ENGINE HOURS 250.00
  • ENGINE 2 FUEL Gas/Petrol
  • ENGINE 2 POWER 425 HP
  • ENGINE 2 YEAR 2022
VIEW BROCHURE

REQUEST INFORMATION

MAIN OFFICE

Sandy Hook Yachts

ADDITIONAL INFORMATION

Helm & Electronics
  • Dual Garmin GPSMAP® 8622 MFD 22" displays
  • Yamaha Command Link Plus CL7 touchscreen
  • Garmin VHF 215 radio
  • SeaStar Maximus digital switching
  • Edson 13" stainless steel steering wheel w/ power knob
  • JL Audio M6 sound system w/ 12 speakers & dual MVi DSP amps
  • Fusion® Apolloâ„¢ stereo + remote
  • Airmar B175M CHIRP transducer
Fishing & Deck Features
  • Dual 30-gallon pressurized aquarium livewells
  • Macerated in-deck fish boxes
  • 6 flush-mounted gunwale rod holders
  • Under-gunwale rod storage & bow storage
  • High-speed livewell pickup & sea chest
  • Dual side entry doors w/ removable boarding ladder
  • Rear insulated cooler, built-in 65 qt. lounge cooler


Comfort & Layout
  • Triple premium captain's chairs at the helm
  • Rear-facing seat w/ sink
  • Console berth w/ sleeping for 2 adults + child, sink, shower, & porcelain head
  • Electric-actuated bow table/sun deck
  • Wraparound bow seating w/ removable backrests
  • Fiberglass hard-top with integrated lighting, tempered glass windshield & vent
  • Sileather® premium marine upholstery
Build & Utility
  • Raw water washdown
  • Trim tabs w/ LED indicators
  • Onboard battery charging system
  • Anchor windlass system w/ 400' line
  • Total Access bilge compartment w/ Seakeeper pod
  • SportTech® vacuum infusion hull construction
  • 10-year hull warranty
Donation Program Notice

This vessel is part of a donation program — ownership transfer may differ from a standard title transfer. Please contact us with any questions before your showing.

Disclaimer

DH Yacht Sales presents the information contained in this listing in good faith and from sources believed to be reliable; however, the Company makes no warranty or guarantee, express or implied, as to the accuracy of this information or the condition of the vessel. Prospective buyers are strongly advised to engage their own agents and/or marine surveyors to independently verify all details material to their purchase decision.


This vessel is offered subject to prior sale, price change, or withdrawal without notice. Engine and generator hours are provided as reported and cannot be guaranteed; actual hours may vary from what is listed.


A closing fee of a minimum of $495.00 will be added to the vessel's final purchase price. Please contact your selling agent for a complete closing statement, as fees may vary by transaction. Coast Guard documentation, state registration, sales tax, and any other applicable fees are not included in the listed price.

Mechanical Disclaimer

Engine and generator hours are as of the date of the original listing and are a representation of what the listing broker is told by the owner and/or actual reading of the engine hour meters. The broker cannot guarantee the true hours. It is the responsibility of the purchaser and/or his agent to verify engine hours, warranties implied or otherwise and major overhauls as well as all other representations noted on the listing brochure.

Listing MLS by Yachtr.com